(Home venue of NFL Minnesota Vikings for 2014 & 2015 seasons)

  • Location: Minneapolis, Minnesota
  • Owner: University of Minnesota
  • Contractor: FIELDS
  • Completed: 2014

Scope of Work:

FIELDS was responsible for removal of the existing aggregate base layers. Design of the hydronic field heating system was a joint effort between Harris Mechanical and FIELDS. The stadium’s new Aquatherm hydronic pipe utilizes the existing steam system. FIELDS installed the new aggregate layers. Impetus for the project was the stadium’s use by the Minnesota Vikings for their 2014 & 2015 season home games, until completion of their new stadium in 2016. TCF Bank Stadium is the home of the Minnesota Golden Gophers of the Big Ten Conference.

Share this Project

AdminTCF Bank Stadium