• Location: Green Bay, Wisconsin
  • Owner: Green Bay Packers, Inc.
  • Contractor: FIELDS
  • Completed: 2013
  • General Contractor: Miron Construction Co., Inc.

Scope of Work:

As part of the Packers’ Lambeau Atrium Entrance renovation project (2013-2015), FIELDS installed the new indoor practice facility’s synthetic turf field. Our scope included subgrade compaction, drainage, vapor barrier, two layers of aggregate, the synthetic turf and its infill. The indoor practice field is used for pre-game walk-throughs, conditioning, rehabilitation, and instruction.

Share this Project

AdminGreen Bay Packers Indoor Practice Facility